Green Day Power

Hours

Friday:
8:00 AM - 6:00 PM
Saturday:
Closed
Sunday:
Closed
Monday:
Closed
Tuesday:
8:00 AM - 6:00 PM
Wednesday:
8:00 AM - 6:00 PM
Thursday:
8:00 AM - 6:00 PM

Chamber Rating

4.1 - (76 reviews)
55
4
1
2
14
Read Our 76 Reviews

Chamber Rating

4.1 - (76 reviews)
55
4
1
2
14
  • Ceren Calis


    May 24th, 2022

  • Patrick Anibaldi

    Im an engineer and over researched our solar panel system purchase in 2022. After interviewing, analyzing more than 12 different quotes we went with Jacob and his team. Wow this was one of the best decisions I made this year. His response time is amazing. His knowledge is great. His service team and quality is exceptional. His pricing is also such a great deal, and believe me I shopped around. Dwgs and permits were turnes around fast. He even got HOA approval for us. We have steel studs and his team was ready for that. The panels look great and we are happy with the production. I have recomended hom to my neighbors and family because he has proven what he can do and it is very impressive.
    May 22nd, 2022

  • Dean Corpuz

    Green Day Power did an excellent job with my install. The install crew were completely professional and were very courteous. I couldnt have asked for a better experience with the purchase of our home generator. Alex and his team were outstanding!!! I will definitely refer Green Day to all of my family and friends!!!
    May 19th, 2022

  • Joshua

    "Hiring the wrong contractor can be a nightmare" - Seth Devey < From Green Day Power’s “About” page. Well, I hired the wrong contractor for sure. Green Day Power was an absolute nightmare to work with!From BIG holes left in my roof, to tons of parts left on my roof, to broken roof ties (that they refused to fix until I produced photos proving that they were not broken before), to multiple missed appointments, to missing city inspections…. This project was a nightmare.During insulation they broke a bunch of roof tiles. We are talking 20+ and they pulled from one spot on my roof to “replace” the missing/broken ones. They also put big lines of caulking over different cracked tiles to “fix them”. The missing tiles were all on the back of the house, between two panel arrays and on the uphill side of my chimney, thus really hard to see from my property. However, due to other issues I did a detailed inspection and found the missing section of my roof. That missing section was left untouched from 2/10/22 until 3/17/22, just over a month. During that time it rained 3 times.I have seen messy contractors, however, they left broken roof tiles, bolts, nails, and other parts laying all over the roof. Some of these items I was able to take off the roof using a short ladder (I was not about to go up on the roof and have them try and say I broke a roof tile). However, some of the items (bolts, nails, and broken roof tiles) all fell off the roof due to the high winds where I live. I’m just thankful that no one got hit by any of the items falling off the roof.Some of the broken roof tiles they just put a big thing of caulking over… and left it. Most of the ones that they did this with were right on the front of the house above the door. Come on really? I asked that they replace those and they said “they were like that already”. However, I was able to produce photos from a few months prior of the roof showing the area in question was not damaged. They said that they had photos contradicting what I said… I asked to see the photos and was told the person who took the photos was “no longer with the company”. They did finally fix the broken tiles above my door.Communication was a total mess! Now to understand this nightmare you have to know that I was sold this system via a sales company called “HomeLink” located in Santa Clarita, Ca. Thus at first Green Day Power would email HomeLink and then HomeLink would email me. Due to this all the communication was a day or so delayed. Upon realizing this I asked if the Green Day Power project manager could just email me directly. However, communication did not get any better. I would be told that someone would be at the house “tomorrow at 8am” and then no one would show up. I would get a call or email saying that it was actually going to be the next day, and then nothing. This was very common and how the whole roofing mess went. I was told 5 different times that they would “be out there tomorrow to fix the roof”. The mail electrical panel upgrade date got moved last minute, the solar install date got moved last minute, inspections got moved or the city inspector would show up and Green Day Power would not be here. They (Green Day Power) would call me and ask if I could meet with the inspector or the city would have to reschedule and it would delay my system.During the initial sales process I noted that I wanted BOTH production and consumption monitoring. I went as far as finding a smart panel with consumption monitoring built in (span panel). However, I was told that the Enphase system would have BOTH production and consumption monitoring built in. However, after the install I was told that they were not going to install consumption monitoring. I called HomeLink (the sales company) and they said that Green Day Power didn’t want to install it. When I pushed Green Day Power finally said that it could get done for an additional cost.If you are in the same boat as I was and you can’t get your project manager on the phone then call the main office (for Green Day Power) and ask for sales. Explain what is going on and then sales will make sure to get you on the phone with a VP or someone who at least has some weight to make sure something gets done. The only issue is the VP does not follow up and the field project manager lets the project fall through the cracks. And then it’s back to calling the sales number. During the 3 months of my install I did this so many times that the sales office knew my name.I could keep going… But I think I have made my point.As of this review I still don’t have access to the Enphase gateway so that I can sync it with the separate consumption monitoring system that I got.To management: Take a step back, make sure that every customer knows the process and what is happening when (it’s ok if it changes… but at least give the customer an idea). Make and keep promises. When a customer calls and says “I have a hole in my roof” don’t laugh and say “that’s common”. I would like to have a follow up call with management and/or the owner to discuss further issues during my install.
    Oct 25th, 2022

  • Lindley Ellisor

    I received 8 calls over 8 days to my work cell from their number. I finally answered and they were looking for someone I dont know. I told them this was a business number but when I enquired they said they installed solar on the ground so I figured, why not have them out to bid our project?! We had their sales manager Guy Spalding out to give us a bid on our day off. He did a very casual walk through our property and he wasted about an hour of our time vaguely discussing their options and promised us a quote within 72 hours. During Guys visit he kept telling us hes our neighbor in the areahe took no measurements, no pictures. Nothing. 2 weeks passed, no bid. We contacted him and he said hed resendI emailed back saying we never received anything to begin withneedless to say days later, the quote never came. Lost another sale here but after seeing the other reviews, it sounds like this Guys a joke and the company is too!
    May 9th, 2022

Read Our 76 Reviews

About
Green Day Power

Family-owned California Solar, Roofing & Generator Company.

Contact Info

Questions & Answers

Q What is the phone number for Green Day Power?

A The phone number for Green Day Power is: (916) 758-8069.


Q Where is Green Day Power located?

A Green Day Power is located at 1100 Olympic Dr, Suite 102, Corona, California 92881


Q What is the internet address for Green Day Power?

A The website (URL) for Green Day Power is: https://greendaypower.com/


Q What days are Green Day Power open?

A Green Day Power is open:
Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Monday: Closed
Tuesday: 8:00 AM - 6:00 PM
Wednesday: 8:00 AM - 6:00 PM
Thursday: 8:00 AM - 6:00 PM


Q How is Green Day Power rated?

A Green Day Power has a 4.1 Star Rating from 76 reviewers.

Hours

Friday:
8:00 AM - 6:00 PM
Saturday:
Closed
Sunday:
Closed
Monday:
Closed
Tuesday:
8:00 AM - 6:00 PM
Wednesday:
8:00 AM - 6:00 PM
Thursday:
8:00 AM - 6:00 PM

Ratings and Reviews
Green Day Power

Overall Rating

Overall Rating
( 76 Reviews )
55
4
1
2
14
Write a Review

Ceren Calis on Google

image


Patrick Anibaldi on Google

image Im an engineer and over researched our solar panel system purchase in 2022. After interviewing, analyzing more than 12 different quotes we went with Jacob and his team. Wow this was one of the best decisions I made this year. His response time is amazing. His knowledge is great. His service team and quality is exceptional. His pricing is also such a great deal, and believe me I shopped around. Dwgs and permits were turnes around fast. He even got HOA approval for us. We have steel studs and his team was ready for that. The panels look great and we are happy with the production. I have recomended hom to my neighbors and family because he has proven what he can do and it is very impressive.


Dean Corpuz on Google

image Green Day Power did an excellent job with my install. The install crew were completely professional and were very courteous. I couldnt have asked for a better experience with the purchase of our home generator. Alex and his team were outstanding!!! I will definitely refer Green Day to all of my family and friends!!!


Joshua on ChamberofCommerce.com

image "Hiring the wrong contractor can be a nightmare" - Seth Devey < From Green Day Power’s “About” page. Well, I hired the wrong contractor for sure. Green Day Power was an absolute nightmare to work with!

From BIG holes left in my roof, to tons of parts left on my roof, to broken roof ties (that they refused to fix until I produced photos proving that they were not broken before), to multiple missed appointments, to missing city inspections…. This project was a nightmare.

During insulation they broke a bunch of roof tiles. We are talking 20+ and they pulled from one spot on my roof to “replace” the missing/broken ones. They also put big lines of caulking over different cracked tiles to “fix them”. The missing tiles were all on the back of the house, between two panel arrays and on the uphill side of my chimney, thus really hard to see from my property. However, due to other issues I did a detailed inspection and found the missing section of my roof. That missing section was left untouched from 2/10/22 until 3/17/22, just over a month. During that time it rained 3 times.

I have seen messy contractors, however, they left broken roof tiles, bolts, nails, and other parts laying all over the roof. Some of these items I was able to take off the roof using a short ladder (I was not about to go up on the roof and have them try and say I broke a roof tile). However, some of the items (bolts, nails, and broken roof tiles) all fell off the roof due to the high winds where I live. I’m just thankful that no one got hit by any of the items falling off the roof.

Some of the broken roof tiles they just put a big thing of caulking over… and left it. Most of the ones that they did this with were right on the front of the house above the door. Come on really? I asked that they replace those and they said “they were like that already”. However, I was able to produce photos from a few months prior of the roof showing the area in question was not damaged. They said that they had photos contradicting what I said… I asked to see the photos and was told the person who took the photos was “no longer with the company”. They did finally fix the broken tiles above my door.

Communication was a total mess! Now to understand this nightmare you have to know that I was sold this system via a sales company called “HomeLink” located in Santa Clarita, Ca. Thus at first Green Day Power would email HomeLink and then HomeLink would email me. Due to this all the communication was a day or so delayed. Upon realizing this I asked if the Green Day Power project manager could just email me directly. However, communication did not get any better. I would be told that someone would be at the house “tomorrow at 8am” and then no one would show up. I would get a call or email saying that it was actually going to be the next day, and then nothing. This was very common and how the whole roofing mess went. I was told 5 different times that they would “be out there tomorrow to fix the roof”. The mail electrical panel upgrade date got moved last minute, the solar install date got moved last minute, inspections got moved or the city inspector would show up and Green Day Power would not be here. They (Green Day Power) would call me and ask if I could meet with the inspector or the city would have to reschedule and it would delay my system.

During the initial sales process I noted that I wanted BOTH production and consumption monitoring. I went as far as finding a smart panel with consumption monitoring built in (span panel). However, I was told that the Enphase system would have BOTH production and consumption monitoring built in. However, after the install I was told that they were not going to install consumption monitoring. I called HomeLink (the sales company) and they said that Green Day Power didn’t want to install it. When I pushed Green Day Power finally said that it could get done for an additional cost.

If you are in the same boat as I was and you can’t get your project manager on the phone then call the main office (for Green Day Power) and ask for sales. Explain what is going on and then sales will make sure to get you on the phone with a VP or someone who at least has some weight to make sure something gets done. The only issue is the VP does not follow up and the field project manager lets the project fall through the cracks. And then it’s back to calling the sales number. During the 3 months of my install I did this so many times that the sales office knew my name.

I could keep going… But I think I have made my point.

As of this review I still don’t have access to the Enphase gateway so that I can sync it with the separate consumption monitoring system that I got.

To management: Take a step back, make sure that every customer knows the process and what is happening when (it’s ok if it changes… but at least give the customer an idea). Make and keep promises. When a customer calls and says “I have a hole in my roof” don’t laugh and say “that’s common”. I would like to have a follow up call with management and/or the owner to discuss further issues during my install.


Lindley Ellisor on Google

image I received 8 calls over 8 days to my work cell from their number. I finally answered and they were looking for someone I dont know. I told them this was a business number but when I enquired they said they installed solar on the ground so I figured, why not have them out to bid our project?! We had their sales manager Guy Spalding out to give us a bid on our day off. He did a very casual walk through our property and he wasted about an hour of our time vaguely discussing their options and promised us a quote within 72 hours. During Guys visit he kept telling us hes our neighbor in the areahe took no measurements, no pictures. Nothing. 2 weeks passed, no bid. We contacted him and he said hed resendI emailed back saying we never received anything to begin withneedless to say days later, the quote never came. Lost another sale here but after seeing the other reviews, it sounds like this Guys a joke and the company is too!


Load More Reviews

Overall Rating

Overall Rating
( 76 Reviews )
55
4
1
2
14

Write a Review

RATING:
Create 1 Star Review Create 2 Star Review Create 3 Star Review Create 4 Star Review Create 5 Star Review

Electrician Near Me in Corona, CA

JS Electric Co
535 Princeland Ct
Corona, CA 92879
(866) 922-8436
( 3 Reviews )
Division 16 Electrical Inc
170 N Maple st Ste 112
Corona, CA 92880
(951) 270-3044
( 0 Reviews )
Starliege Electric
Service Area
Corona, CA 92881
(951) 963-3744
( 0 Reviews )
Viveros Electric
529 Mesa Dr
Corona, CA 92879
714-658-9537
( 2 Reviews )
Rory's Electrical Handyman
12050 Margis St
Corona, CA 92883
(951) 271-0171
( 0 Reviews )
Liberty First Electric Repair Partners Inc
541 N Main St
Corona, CA 92880
(951) 210-7928
( 0 Reviews )
Circle Connect Electric
(657) 293-4235
( 0 Reviews )
A &W Electrical Contractors
254 Ott st Ste G, G Ste
Corona, CA 92882
(951) 735-7188
( 0 Reviews )

START DRIVING

ONLINE LEADS TODAY!

ChamberofCommerce.com
Loading