  • Rachel Oakman

    Finished my sheshed. Took a little longer than expected but Im fine with that because there was always good communication. Great work, and I appreciate the ac/heat unit suggestion, definitely was a better option than what I initially thought I wanted.
    Dec 29th, 2023

  • Matthew Miller

    Midnight construction did an amazing job at transporting our home from the latest early 1981 had to offer to something we only envisioned in our wildest dreams. Ty and the rest of the guys and gal were very punctual and hospitable at moving our cherished belongings in and out of the home. Thank you Ty and rest of the guys and gal for exceeding my wildest dreams. Thank you again!!!! Services: Install flooring, Bathroom remodeling, Paint indoors, Carpentry services, Flooring
    Jun 30th, 2022

  • Evan Browning


    May 13th, 2019

  • Kristin Holbert

    Update: We are still having issues that we are trying to fix ourselves including the fact that he did not seal the tile outside of the shower and tub (and told us as much after we had issues with leaks in the first year). --- In short, if I had wanted to pay a lot of money for people without experience to remodel my home and take a long time, My husband and I would have done so ourselves instead of paying a contractor. Job description: We had a few projects to be done the kitchen, guest bath, adding a master bath and washer/dryer hookups in house (very different from original plan), and adding an access door to garage. It took 6.5 months instead 6 wks. Pros: 1. The main tile guy, Josh, was very friendly and cared a lot about the work he did in laying the tile. 2. Ty's mentor, Mike Lemley, assisted on some tricky points in the job and fixed some other errors that the Mid-Knight crew made. He had other jobs but truly helped us out of a jam. Without his help I feel that this remodel would still be ongoing. Cons: 1.It was like PULLING TEETH to get a WRITTEN ESTIMATE that was VERY LACKING IN DETAILS. We wish we had written up more of a contract before starting work with him. 2. DESPERATE to maintain his REPUTATION. He begged like a child for 5 stars even though he knew we weren't happy. 3. Refused to let us help with painting etc. to keep costs down. 4. RUDE. There was one major mistake regarding the grout color. Ty convinced us to use the same grout color in our kitchen and master bath (linen) because of similar color schemes. The guest bath was to be grey. They put grey in the master. They scraped it out while still wet to try and fix their error. His crew had family obligations so Ty came over to finish fixing the mistake. He asked me to point out areas where I still saw the wrong color in the flooring so that he could scrape out the wrong color and put in the correct color. Knowing he was not feeling well, I let him skip fixing the spots that the vanity and toilet would cover. Yet after about an hour, he yelled at me for finding more spots on the floor. (He did later apologize for how unprofessional this was.) When I tried to point out that there were some problems with the wrong color in the tile of the shower, he refused to acknowledge that they were there and did not fix them. I still notice those spots. 5. CUTS CORNERS and MAKES UNKEPT PROMISES. Ways he cut corners: a. Ty promised that if we used a two panel door from one of our closets for the guest bathroom that he would replace that closet door with another new two paneled door. Instead he replaced it with a spare single panel door that was dirty and marked up with unmatching paint. b. Promised to install a bar or our laundry room where we could hang things only to later say that we could purchase a cheap tension rod. c. He did not fix the cracking grout or missing caulk in areas even though I pointed them out multiple times. d. Damaged kitchen cabinets during install and did not replace. e. Cheap plywood used for front and sides of our pantry. and we were not given any input. f. Ty decided on how and where to put can lights in both bathrooms without consulting our desires. He was very upset with me when I said I wanted a light fixture directly above the vanity. He tried to tell me in was unnecessary. g. Paint drops were left on our newly lain bathroom tile and grout. They said sorry, theres nothing they could do. i. The access door to the garage is sloppily done. 6. FORGETFUL and doesnt write things down. 7. Used materials purchased for our job on other jobs and was very inefficient in his use of materials. This is probably a main reason why he was losing some profit on our job (something he regularly complained about to us). 8. Left our garage and house a MESS. 10. TOOK OTHER JOBS while working on ours. There were times that we did not see Ty or his crew for weeks on end, even though we would persistently contact him. *** Get your work done through Mike Lemley. His work is worth the wait and he fixed many errors while working as a special favor for Ty.
    Dec 25th, 2020

Read Our 4 Reviews

About
Midknight Construction

Midknight Construction is located at 1801 Hayes St in Wichita Falls, Texas 76309. Midknight Construction can be contacted via phone at 940-357-1010 for pricing, hours and directions.

Contact Info

  •   940-357-1010

Questions & Answers

Q What is the phone number for Midknight Construction?

A The phone number for Midknight Construction is: 940-357-1010.


Q Where is Midknight Construction located?

A Midknight Construction is located at 1801 Hayes St, Wichita Falls, TX 76309


Q How is Midknight Construction rated?

A Midknight Construction has a 4.0 Star Rating from 4 reviewers.

Ratings and Reviews
Midknight Construction

Overall Rating

Overall Rating
( 4 Reviews )
3
0
0
0
1
Write a Review

Rachel Oakman on Google

image Finished my sheshed. Took a little longer than expected but Im fine with that because there was always good communication. Great work, and I appreciate the ac/heat unit suggestion, definitely was a better option than what I initially thought I wanted.


Matthew Miller on Google

image Midnight construction did an amazing job at transporting our home from the latest early 1981 had to offer to something we only envisioned in our wildest dreams. Ty and the rest of the guys and gal were very punctual and hospitable at moving our cherished belongings in and out of the home. Thank you Ty and rest of the guys and gal for exceeding my wildest dreams. Thank you again!!!! Services: Install flooring, Bathroom remodeling, Paint indoors, Carpentry services, Flooring


Evan Browning on Google

image


Kristin Holbert on Google

image Update: We are still having issues that we are trying to fix ourselves including the fact that he did not seal the tile outside of the shower and tub (and told us as much after we had issues with leaks in the first year).
---
In short, if I had wanted to pay a lot of money for people without experience to remodel my home and take a long time, My husband and I would have done so ourselves instead of paying a contractor.
Job description: We had a few projects to be done the kitchen, guest bath, adding a master bath and washer/dryer hookups in house (very different from original plan), and adding an access door to garage. It took 6.5 months instead 6 wks.
Pros:
1. The main tile guy, Josh, was very friendly and cared a lot about the work he did in laying the tile.
2. Ty's mentor, Mike Lemley, assisted on some tricky points in the job and fixed some other errors that the Mid-Knight crew made. He had other jobs but truly helped us out of a jam. Without his help I feel that this remodel would still be ongoing.
Cons:
1.It was like PULLING TEETH to get a WRITTEN ESTIMATE that was VERY LACKING IN DETAILS. We wish we had written up more of a contract before starting work with him.
2. DESPERATE to maintain his REPUTATION. He begged like a child for 5 stars even though he knew we weren't happy.
3. Refused to let us help with painting etc. to keep costs down.
4. RUDE. There was one major mistake regarding the grout color. Ty convinced us to use the same grout color in our kitchen and master bath (linen) because of similar color schemes. The guest bath was to be grey. They put grey in the master. They scraped it out while still wet to try and fix their error. His crew had family obligations so Ty came over to finish fixing the mistake. He asked me to point out areas where I still saw the wrong color in the flooring so that he could scrape out the wrong color and put in the correct color. Knowing he was not feeling well, I let him skip fixing the spots that the vanity and toilet would cover. Yet after about an hour, he yelled at me for finding more spots on the floor. (He did later apologize for how unprofessional this was.) When I tried to point out that there were some problems with the wrong color in the tile of the shower, he refused to acknowledge that they were there and did not fix them. I still notice those spots.
5. CUTS CORNERS and MAKES UNKEPT PROMISES. Ways he cut corners:
a. Ty promised that if we used a two panel door from one of our closets for the guest bathroom that he would replace that closet door with another new two paneled door. Instead he replaced it with a spare single panel door that was dirty and marked up with unmatching paint.
b. Promised to install a bar or our laundry room where we could hang things only to later say that we could purchase a cheap tension rod.
c. He did not fix the cracking grout or missing caulk in areas even though I pointed them out multiple times.
d. Damaged kitchen cabinets during install and did not replace.
e. Cheap plywood used for front and sides of our pantry. and we were not given any input.
f. Ty decided on how and where to put can lights in both bathrooms without consulting our desires. He was very upset with me when I said I wanted a light fixture directly above the vanity. He tried to tell me in was unnecessary.
g. Paint drops were left on our newly lain bathroom tile and grout. They said sorry, theres nothing they could do.
i. The access door to the garage is sloppily done.
6. FORGETFUL and doesnt write things down.
7. Used materials purchased for our job on other jobs and was very inefficient in his use of materials. This is probably a main reason why he was losing some profit on our job (something he regularly complained about to us).
8. Left our garage and house a MESS.
10. TOOK OTHER JOBS while working on ours. There were times that we did not see Ty or his crew for weeks on end, even though we would persistently contact him.
*** Get your work done through Mike Lemley. His work is worth the wait and he fixed many errors while working as a special favor for Ty.


Overall Rating

Overall Rating
( 4 Reviews )
3
0
0
0
1

Write a Review

RATING:
Create 1 Star Review Create 2 Star Review Create 3 Star Review Create 4 Star Review Create 5 Star Review

Contractor Near Me in Wichita Falls, TX

Norco Window Mfg
1608 35th St
Wichita Falls, TX 76302
940-723-1421
( 21 Reviews )
Clear Edge Contracting
4607 Old Jacksboro Highway
Wichita Falls, TX 76302
(940) 631-3890
( 6 Reviews )
Rhodes Construction
755 Huntington Ln
Wichita Falls, TX 76305
(940) 855-5474
( 0 Reviews )
Home Services at The Home Depot
3705 Kell E Blvd
Wichita Falls, TX 76308
940-226-1306
( 1 Reviews )
Cherokee Construction Co. General Contractor LLC
2312 Roberts Ave
Wichita Falls, TX 76301
940-386-3991
( 1 Reviews )
Installation Services
3301 Kell E Blvd
Wichita Falls, TX 76308
( 0 Reviews )
Hughes & Son Homes, LLC
(940) 224-5460
( 0 Reviews )
Furniture Medic by CST Restoration
410 Virginia Ave
Wichita Falls, TX 76301
(972) 510-4178
( 2 Reviews )

START DRIVING

ONLINE LEADS TODAY!

ChamberofCommerce.com
Loading